It is the total deposition which is based on interpolating/krigging methods from a measured network to create a 5km grid. Some parts of the total (dry deposition NH3) are from modelled output.
1stTermClass:
It is the total deposition which is based on interpolating/krigging methods from a measured network to create a 5km grid. Some parts of the total (dry deposition NH3) are from modelled output.